Hunterston Weather Envelope

Hunterstonnuclear.jpg

British Nuclear Group is decommissioning Hunterston, a nuclear power station. The decommissioning strategy adopted by them includes transforming the reactor buildings into ‘safestores’ to allow the residual radioactivity to decay to a low level. The life of the transformed building is to be 100 years.

In Phase 1 of the Weather Envelope Project British Nuclear Group commissioned a consulting engineer to provide an exemplar design for a new weather envelope to replace the deteriorating façade of patent glazing and to provide a new roof.

Cadogans was appointed as Design Checker of that exemplar design.

The exemplar design included the following:

  • Structural check of existing building
  • Design of new weather envelope
  • Wind tunnel testing
  • Internal environment and passive ventilation studies

Cadogans main duties were as follows:

  • Review of methodologies prepared by the Designer
  • Independent structural analysis Independent design review
  • Independent assessment of wind speeds and force
  • Review of all calculations, drawings and documents submitted by the Designer
  • Preparation of Final Report