Case Studies

Corpach Hydro Scheme

corpach.jpg

Type of Project

  • Civil and Structural

Outline of Project

Cadogan Consultants were appointed to provide a cost effective facility for managing the water levels in the Caledonian Canal during periods of high water flow.

Cadogan Consultants main responsibilities were:

  • Design of reinforced concrete weir
  • Design of timber stop logs.
  • Design of reinforced concrete bridge deck
  • Design of reinforced concrete abutments, piers and wingwalls
  • Production of specifications
  • Production of construction drawings

Key skills used by Cadogan Consultants

  • Civil & Structural Design
  • Geotechnical Design

Engineering Discipline

People