Case Studies

Weld Failure

weldfail.jpg

Outline of Project

A public  body owned a pipeline conveying water at 180°C and 13 bar gauge in which the  welds began to fail progressively. A court action was raised against the  installers of the pipeline.

A senior member of Cadogan's staff was appointed as expert  witness for the claimant.

The work included visual inspections, radiography,  metallurgical examination, liaison with an expert on fracture mechanics, design  checking and assessment of operation and maintenance. The welds were diagnosed  as failing from stress-corrosion cracking. The stress levels in the welds were  so high as to render a normally benign environment corrosive. Reports were  written and submitted and the case settled in favour of the claimant before  trial.

Cadogan Consultants was commissioned as Consulting Engineer  for the replacement pipeline.

key skills used by cadogan consultants

  • Engineering Analysis
  • Welding and metallurgy
  • Knowledge of design, operation and maintenance
  • Report writing
  • Assisting legal team

Engineering Discipline

People